Contact Us Today!

Sales & Estimating: 720.469.8374

St. Pauls Plaza – Chula Vista, CA

Posted by on Aug 1, 2014 in Current Projects, Integra Updates, News, Uncategorized |

      Integra continues to reach new heights!  Our recent project takes us down to Chula Vista, California.  The use of  pre-fabricated  cold-formed steel trusses shown in these pictures (above shown) is just the beginning.  Not only is Ultra Span tattooed all over the jobsite but Cold Formed Panelizaton is another introduced element to add to our resume.  We have teamed up with our client to complete this project in 55 days....

Read More

USARC – Windsor, CO

Posted by on Jul 30, 2014 in Current Projects, Integra Updates, News |

Integra Steel Truss has earned the business of a new client by successfully completing a 38,000+ square foot Design/Build project without a bust.  Integra Steel Truss delivered 52-tons of Ultra-Span pre-fabricated cold-formed steel/light gauge metal trusses over a highly choreographed 3-week period. In addition to the BIM designed trusses, Integra Steel Truss provided a value-engineered lateral truss blocking system, designed a custom...

Read More

Bay Meadows – San Mateo, CA

Posted by on Dec 9, 2013 in Current Projects, Integra Updates, News |

With Bay Meadows being one of the “Largest Re-Development sites remaining in the San Francisco Bay Area,” Integra felt it the perfect opportunity to be able to leave its mark on another California Project. This project included residential homes, offices, as well as retail space. Another great opportunity for Light-Gauge Steel to prove its worth and ease of installation! Great Job Integra!

Read More

SOF COF – JBLM, WA

Posted by on Dec 7, 2013 in Current Projects, Integra Updates, News, Uncategorized |

This Design-Build Company Operations Facility (COF) in Joint Base Lewis McChord (JBLM), Washington is another Building Information Modeling (BIM) collaboration, with Integra’s design team being able to assist in some of the fine tuning of the roof structure. Our customer was able to pre-construct the entire truss system on the ground, before hoisting it atop the finished building, quickly and safely. Pre-planning resulted in a great...

Read More